Serial |
Page |
Reference |
Amendment/Comment |
Source/ Status |
1 |
55 |
Free camping |
Change 41° 55' 44"S 145° 10' 12"E to 41° 55' 38 "S 145° 10' 17"E
Change 41° 54' 06"S 145° 24' 05"E to 41° 54' 01 "S 145° 24' 10"E
Change 41° 47' 42"S 145° 25' 53"E to 41° 47' 36"S 145° 25' 58"E
|
A/C
Mar 09 |
2 |
84 |
Free camping |
Change 45° 35' 42"S 146° 24' 16"E to 42° 45' 30 "S 146° 24' 21"E
Change 42° 51' 35"S 146° 13' 57"E to 42° 51' 29 "S 146° 14' 02"E
Change 42° 08' 42"S 145° 38' 57"E to 42° 47' 13"S 146° 03' 39"E
Change 43° 01' 58"S 146° 20' 54"E to 43° 01' 53 "S 146° 20' 59"E
Change 43° 02' 23"S 146° 18' 03"E to 43° 02' 17"S 146°18' 08"E
|
A/ C
Mar 09 |
3 |
89 |
Free camping |
Change 43° 05' 36"S 147° 00' 32"E to 43° 05' 31 "S 147° 00' 37"E
Change 43° 09' 38"S 146° 58' 41"E to 43° 09' 32 "S 146° 58' 46"E
Change 43° 15' 45"S 147° 14' 25"E to 43° 15' 40"S 147° 14' 30"E |
A/C
Mar 09 |
4 |
100 |
Free camping |
Change 43° 05' 49"S 146° 43' 45"E to 43° 05' 43 "S 146° 43' 49"E
Change 43° 18' 02"S 146° 54' 37"E to 43° 17' 54 "S 146° 54' 45"E |
A/C
Mar 09 |
5 |
15 |
All |
The local Council has closed the Loriinna Road with a boom gate due to its perceived danger. Access to Lorinna is now only possible from the south. It is not now a through track. |
A/C
Apr 09 |
6 |
148 |
9.6 |
Change 41° 16' 56"S 148° 15' 15"E to 41° 16' 56 "S 148° 09' 15"E |
U/C
May 09 |
7 |
103 |
top right hand corner |
Change page 97 to page 99 |
U/C
May 09 |
8 |
93 |
All |
White timber trail is blocked due to forestry road construction. More to follow See serial 23 |
A/C
Jun 09 |
9 |
71 |
All |
Hydro Electric Commission has locked this track. No explanation given. see Serial 27 |
A/C
Jun 09 |
10 |
173
176 |
Before you start |
Report received that the bridge over the Ringarooma River is at present being rebuilt. See Serial 20 |
U/UC
Jul 09 |
11 |
179 |
3.2 |
The bridge just north of this point is in poor condition. The ford adjacent has a soft bottom. Take care.  |
U/UC
Jul 09 |
12 |
156 |
|
The track is blocked with a fallen tree and winching is required to negotiate the obstacle. It is planned to remove the tree in the summer once the track dries out. |
U/C
Aug 09 |
13 |
168 |
2.5 |
Part of track washed away but location not clear. Impassable to 4WD vehs. More to follow.
Disregard - Refers to another track. |
U/UC
Sep 09 |
14 |
115 |
15.3 |
The bridge has been washed away by flood. The road is not negotiable at present.
See Serial 36
|
A/C
10/09 |
15 |
73 |
Permits |
Keys are now also available from the Strahan office which is open week days only. |
G/C
Dec 09 |
16 |
51 |
All |
This track has eroded considerably and is now very difficult. |
A/C
1/10 |
17 |
126 |
|
The walking tracks at this site have been marked, including a track to a sandstone quarry. |
A/C
1/10 |
18 |
89 |
Free camping |
A fee is now payable at Franklin and Port Huon. |
A/C
1/10 |
19 |
93 |
6.8 |
A new forestry road has been constructed linking to this track. Turn right into the forestry road and turn left after 900m. |
A/C
2/10 |
20 |
173
176 |
Before you start |
Report received that bridge completed and being used but not officially open. |
U/UC
Mar 10 |
21 |
170 |
0.8 |
Report received that bridge has deteriorated. Take extra care. |
U/UC
Mar 10 |
22 |
166 |
Difficulty |
Change to 'Easy with a difficult ford to negotiate' |
U/C
Apr 10 |
23 |
73 |
All |
Parks have advised this track is closed for the time being due to a potential land slip.
Works to be carried out soon and track to be reopened 3rd June. (May 10)
|
G/C
Apr 10 |
24 |
96 |
1.4 |
Forestry operations will affect the Braken Ridge Track in a few months time. More to follow. |
G/C
May 10 |
25 |
156 |
|
See serial 12. Report received the tree has been removed. |
U/UC
May 10 |
26 |
91 |
|
Considerable work has been undertaken on this track by the authorities and the difficulty is now rated medium. See Serial 35 |
G/C
Jun 10 |
27 |
71 |
|
Mt Huxley track is now available but a key is required. Contact Leigh Clark at Forestry Tasmania on 0418599205 (based in Burnie). |
G/C
Jun 10 |
28 |
54 |
|
The Spray Tunnel has been closed to vehicular traffic and is to be developed as a walk. |
G/C
July 10
|
29 |
79 |
2.2 |
Due to vandalism to communication installations located on top of Tim Shea a boom gate is to be erected restricting access. A key will be available from Forestry Tasmania, Hobart and from the new Adventure Hub at Maydena. |
G/C
Oct 10 |
30 |
30 |
|
A new permit system for the Arthur Pieman Conservation Area will commence on 1 December 2010 involving a $80 annual fee or a $30 monthly fee. |
G/C
Oct 10 |
31 |
103 |
|
Boney Road is rated 'Hard' at present due to several deep mud holes. Action is planned to drain the track to return it to a 'Medium' route. |
A/C
Nov 10 |
32 |
151 |
2.9 |
Sun Flats Road has been subject to a wash-out and is impassable. It is suggested that at point 2.9 the alternative route via Lotta be used until further notice. |
U/C
Mar 11 |
33 |
118 |
|
A report has been received that the Swanston Track has been damaged by flood. The report states that trees are down and chainsaws are required. Please report any updates.
A tree is across the track and there are a few washouts but the track can be negotiated by standard vehicles.. Tree cleared. (U/C 18 Apr 11)
|
U/C
Mar 11 |
34 |
ii & 6 |
|
Change address from "PO Box30, Rosny Park" to "412 Pass Road, Cambridge Tas 7170" |
A/C
Apr 11 |
35 |
91 |
|
The Jefferys Track is at present rated 'Hard' with possible winching required. |
U/C
May 11 |
36 |
115 |
15.3 |
Robertsons Bridge has been reconstructed with a concrete structure and the road is now open. The rain forest walk is not available. |
Press
May 11 |
37 |
51, 64 |
|
Due to a mountain bike event, access to Montezuma Falls will not be available on Sunday 29 January 2012 and Climies Track will be closed on Monday 30 January 2012. |
A/C
June 11 |
38 |
96 |
1.4 |
Report received advises the Braken Ridge Fire Trail has been upgraded to a gravelled road. This makes the entire route "Easy". |
U/C
Aug 11 |
39 |
184 |
11.3 |
Report received that there some deep holes in the Bridport end of the track before entering onto the beach (head light depth if hole is full of water). |
U/C
Oct 11 |
40 |
38 |
6.0 |
Dawson Creek bridge will be closed for repairs 24-28 Oct 2011. No access in this period. |
G/C
Oct 11
|
41 |
175 |
2nd 0.0 |
Add after 0.0 "0.3 (0.3) Veer right just before boom gate." Change "1.2 (1.2)" to "1.2 (0.9)"
Construction work installing pipes from Frome Dam to Herrick |
A/C
Oct 11 |
42 |
170 |
|
Erosion has made this track more difficult. Change Difficulty to Hard. |
A/C
Oct 11 |
43 |
20 |
27.0 |
Report received that forestry operations have created a Y junction at approx 31.2km. Keep right. |
U/UC
Jan 12 |
44 |
143 |
|
The Eddystone Pt to Ansons Bay Track has been closed by the Parks and Wildlife Service due to its condition. 4WD Tasmania is negotiating to have it reopened. |
G/C
Feb 12
|